Basic process sequence of sheet metal processing 10

Programming: It refers to using the programming software of the equipment manufacturer to carry out the processing program of the sequence of punching and die processing on the special computer with the CAD drawing files of the process department. Normally, the least number of punches should be used, and the trimming is normally guaranteed. When the machine tool is running normally, it must be on the same side.

 

Drilling tooling: refers to a mold plate that needs to be positioned by manual drilling, which should be considered by the process engineer when doing the product process.

 

Welding tooling: refers to technical requirements such as welding size, angle, position, and space size, etc., which should be considered by the process engineer when making the product process.

 

Spraying conductive protective tooling: refers to the large area of spraying protection, which can be sprayed with iron plates and fixed installation methods. It can only be applied when a large number of workpieces are moved.

 

Assembly tooling/checking tools: During assembly, in order to ensure that the size of the customer’s application does not appear to be improperly installed when the customer responds, we must conduct a full tooling and full inspection of the size and screws used by the customer during assembly, such as 19-inch installation hole spacing. It should be considered by the process engineer when doing the product process.

 

Bending fixture: refers to batch and complex workpieces, which should be considered by the process engineer when doing the product process.